Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C intelligent integrated vehicle-mounted arch frame trolley is a state-of-the-art device designed for seamless steel arch frame installation, welding mesh, connecting ribs, and precise excavation surface measurement. Equipped with a robust vehicle chassis, this equipment ensures unparalleled flexibility, effortless movement, and swift transitions, making it an ideal solution for a wide array of demanding environments. Featuring remote operation for all three booms and manual control from the hanging basket for the left and right booms, it dramatically reduces labor costs, minimizes construction risks, enhances operational efficiency, and standardizes the process of installing tunnel vertical arches.
Equipment digitization (Optional): Our advanced digitization options encompass cluster management, precise positioning functions, comprehensive video surveillance, efficient intercom systems, proactive pre/alarm functions, extensive data management, sophisticated tunnel BIM technology, digital twin capabilities, detailed construction report management, thorough tunnel contour scanning, and seamless remote control, providing a holistic digital solution for modern tunneling projects.
High Efficiency: With three arms and three grippers, complemented by a multi-degree-of-freedom manipulator, this equipment offers exceptional performance. Each arm boasts a maximum lifting force of 1.5 tons, meeting the demands of prefabricated arch installation, various benching method operations, and precise positioning and adjustment of arches. Remarkably, all construction procedures for vertical support can be completed within an hour, showcasing its superior efficiency.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly techniques (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), we produce arch frames outside the tunnel. This innovative approach significantly reduces the time spent on hazardous surfaces, mitigates construction safety risks, and substantially enhances overall efficiency.
Reduced Operating Personnel: This cutting-edge equipment requires only 3 personnel to complete the entire construction operation, a stark contrast to the traditional requirement of 8 or more, epitomizing efficiency and cost-effectiveness.
Additional Options: Tailor the functionality to your project needs with selectable options such as an electric drive for hydraulic systems, a breaker for under-excavation operations, an electric welding machine, and more, allowing for a customized and efficient solution.