Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LGM312N The groundbreaking LGM312N intelligent integrated arch anchor trolley is engineered with an advanced chassis and a robust dual anchor system. This state-of-the-art machine boasts four-wheel steering, four-wheel drive, and bi-directional driving capabilities. The innovative diesel-electric dual-power system offers the flexibility of electric construction with a diesel-powered emergency backup. Equipped with a sophisticated three-arm remote control, this versatile trolley is adept at handling the installation of prefabricated arch frames, executing various benching methods, and ensuring precise positioning adjustments. It can seamlessly manage under-excavation and welding operations, making it an incredibly flexible solution for tunnel constructions.
Functional Integration: The intelligent integrated arch anchor trolley masterfully combines an array of processes into a single unit. This includes measuring and point placing, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, and optional anchor grouting. This all-in-one solution streamlines operations and enhances efficiency.
Equipment Digitization (Optional): Optional advanced features include cluster management, precise positioning, video surveillance, walkie-talkie functionality, pre/alarm notifications, comprehensive data management, tunnel BIM technology, digital twin capabilities, construction reporting, and more.
Additionally, the system supports tunnel contour scanning, remote control operations, and a suite of other advanced functionalities.
High Efficiency: Our LGM312N features an innovative three-arm, three-gripper, and three-basket structure, delivering a maximum lifting force of 3 tons via the central arm. This allows the entire construction process to be completed in approximately one hour, significantly boosting productivity.
Installation of Prefabricated Arch Frames: Leveraging our patented multi-frame prefabricated segmented assembly and folding arch frame installation techniques, the prefabricated arch frames are produced outside the tunnel. This method minimizes on-site working time on hazardous surfaces, enhances construction safety, and substantially increases overall efficiency.
Dual Anchor System: With an impressive maximum drilling depth of 4.5 meters, the LGM312N's left and right arm frames are capable of performing feet locking, system anchoring, and advance anchoring operations simultaneously.
Rotating Deployable Hanging Basket: The LGM312N is also equipped with a rotating hanging basket, providing a larger operating space ideal for the installation of explosives and anchor rods.
Optional Grouting Function: Our equipment features an optional grouting system, enabling quick and efficient grouting operations immediately after anchor installation.
Reduced Operating Personnel: Remarkably, the entire construction process requires only 3-4 personnel, a significant reduction compared to the 8 or more required for traditional methods.
Auxiliary Function Integration: The LGM312N comes equipped with auxiliary tools such as a breaker hammer and a welding machine, facilitating under-excavation processing and welding operations during arch installation.
Transport dimensions (L × W × H) | 11360×3665×3355mm |
Total weight | 38t |
Engine power | 138.5kW (National IV) |
Installed electrical power | 159kW |
Operating mode | Electric construction + diesel-powered walking and emergency |
Control mode | Wireless remote control + manual control |
Operating voltage | 380V |
Operating range (width × height) | 17×12m |
Chassis form | Operating chassis |
Driving mode | Bidirectional driving (front and rear dual cabs) |
Driving and steering methods | Four-wheel drive, four-wheel steering |
Minimum ground clearance | 380mm |
Maximum grade | 36% |
Turning radius | 15m (two wheels)/ 8m (four wheels) |
Maximum speed | 15km/h |
Approach angle/departure angle | 15.4°/15.7° |
Arm support mode | Two stage telescopic |
Arm support quantity | 3 |
Hanging basket mode | Expandable |
Number of hanging baskets | 3 |
Number of grippers | 3 |
Maximum lifting capacity of middle arm | 3t |
Maximum lifting capacity of left and right arms | 1.5t |
Number of rock drills | 2 |
Power of rock drills | 18kW |
Advance beam | 5590mm(6200/4990mm) |
Drill Pipe | 4305mm(4915/3700mm) |
Maximum drilling depth | 4m(4.6m/3.4m) |
Drilling diameter | Φ41~Φ102mm |
Discharge volume | 0.98m³/min |
Discharge pressure | 0.8MPa |
Flow rate | 16m³/h |
Pressure | 20bar |
Welding machines | 3 sets |
Breaking hammers | 2 sets |
Grouting system | Options |
Three remote controls/one remote control | Unidirectional driving |
Breaker | Front wheel steering |
Electric Welding Machine | Combustible Gas Detector |
Middle arm bearing capacity of 1.5t | Hole cleaning device |
Grouting system |
1,What can you buy from us?
Our current main products include comprehensive solutions for underground engineering machinery and intelligent mining equipment. This includes tunnel boring machines, integrated arch anchoring and spraying trolleys, arch anchoring trolleys, integrated arch drilling trolleys, arch frame installation trolleys, wet spraying rigs, and rock drilling rigs. We have the capacity to provide customers with integrated total solution services.
2,What about the MOQ?
The Minimum Order Quantity (MOQ) is 1 set.
3,What payment terms do you accept?
We accept T/T with a 50% prepayment.
4,What about the order lead time?
The usual lead time is 15 days.
5,What logistics methods can you use for shipment?
Truck delivery can be arranged in Central Asia and Russia, and you can also choose rail and sea shipping.
6,How is your delivery time?
The delivery time via China-Europe trains is 15 to 20 days, while sea shipping takes approximately 2 to 3 months.
7,How about your customer service and after-sales service?
We offer 24/7 online support and provide after-sales support in Russia and Central Asia.