Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LG312M The state-of-the-art LG312M intelligent integrated arch frame trolley masterfully combines multiple processes including measuring, placing points, under-excavation operations, arch frame installation, welding mesh, and connecting ribs. This revolutionary machine completes the installation of arch frames during the one-time excavation of double-track tunnels without the need for repositioning. Boasting an engineering chassis, diesel-electric dual power systems, and a two-way driving platform structure, it excels in driving performance and adaptability to various complex tunnel road conditions. The arm frame's wireless remote and manual control operations provide precise, simple control of the robotic arm, ensuring operations are fast, efficient, energy-saving, and safe.
Equipment Digitization (Optional): Our advanced digital solutions include cluster management, positioning functions, video surveillance, walkie-talkie functions, pre/alarm functionalities, data management, tunnel BIM technology, digital twin, construction report management, tunnel contour scanning, remote control, and more.
Expandable Hanging Basket: Equipped with an expandable hanging basket, this equipment offers a larger operating space ideal for installing explosives and anchor rods, enhancing operational flexibility and safety.
High Efficiency: Our innovative design features a three-arm, three-gripper, and three-basket structure, with the middle arm boasting a maximum lifting force of 3 tons. Capable of implementing various construction methods such as full-section, two-benching, and three-benching, the equipment can be set up in approximately an hour, significantly optimizing efficiency.
Installation of Prefabricated Arch Frames: Employing our company's patented multi-frame prefabricated segmented assembly and multi-frame prefabricated folding arch frame installation techniques, arch frames are produced outside the tunnel. This innovation reduces working time on dangerous surfaces, minimizes construction safety risks, and greatly enhances overall efficiency.
Fewer Operating Personnel: Streamline operations with a team of only 3-4 people, compared to the traditional requirement of 8 or more, significantly reducing labor costs and increasing productivity.
Auxiliary Function Integration: The equipment includes a breaker hammer and welding machine, enabling efficient under-excavation processing and welding operations during arch installation.
Compact Overall Size: Designed to be lightweight and compact, this vehicle is perfectly suited for small-section construction conditions, offering unparalleled adaptability and maneuverability.