Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The intelligent integrated vehicle-mounted Arch Frame Trolley is a groundbreaking piece of equipment delivering seamless steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement. Engineered with a robust vehicle chassis, it ensures agile mobility, swift transitions, and impeccable reliability in any environment. Operate all three booms remotely or manually control the left and right booms from the hanging basket, significantly reducing labor costs, mitigating construction risks, enhancing efficiency, and elevating tunnel vertical arch construction to new standards of precision and factoryization.
Equipment Digitization (Optional): Experience the future of mining operations with optional digital features such as cluster management, precise positioning, comprehensive video surveillance, intercom functionality, pre/alarm system, extensive data management, cutting-edge tunnel BIM technology and digital twin, construction report management, advanced tunnel contour scanning, and remote control capabilities, all designed to streamline and optimize your workflow.
High Efficiency: Equipped with three arms, three grippers, and a versatile multi-degree-of-freedom manipulator, this trolley boasts a maximum single-arm lifting force of 1.5 tons. Perfect for prefabricated arch installations and various benching methods, it ensures precise positioning and adjustment of the arch. Complete all vertical support construction procedures in just about an hour, revolutionizing efficiency and productivity.
Installation of Prefabricated Arch Frames: Utilizing our patented multi-frame prefabricated segmented assembly technique (Multiple Prefabricated Arch Frame - Patent No. ZL20222537953.5), we manufacture arch frames outside the tunnel, minimizing on-site working time, reducing exposure to hazardous conditions, and drastically improving overall construction safety and efficiency.
Reduced Staffing Requirements: Streamline operations with minimal manpower. The entire construction process can be executed by just 3 personnel, a significant reduction from the 8 or more required in traditional methods.
Additional Options: Customize your equipment to meet specific operational needs with optional features like an electric drive for hydraulic systems, a breaker for under-excavation tasks, an electric welding machine, and more.