Customization: | Available |
---|---|
After-sales Service: | 6 Month |
Warranty: | 6 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The LCG312C The LCG312C is an intelligent, integrated, vehicle-mounted arch frame trolley designed to revolutionize mining operations. This state-of-the-art device combines steel arch frame installation, welding mesh and connecting ribs, and excavation surface measurement into one seamless operation. Mounted on a versatile vehicle chassis, it ensures flexibility, ease of movement, and rapid responses to emergencies. The LCG312C excels in any scenario, delivering reliable and efficient performance. Equipped with three booms, which can be operated remotely or manually from a hanging basket, this equipment significantly reduces labor costs, enhances construction safety, boosts efficiency, and standardizes tunnel vertical arch installations.
Equipment Digitization (Optional): Our cutting-edge technology offers optional digitization features, including cluster management, precise positioning functions, video surveillance, intercom capabilities, advanced pre/alarm systems, comprehensive data management, tunnel BIM technology and digital twin, construction report management, tunnel contour scanning, and remote control functionalities.
High Efficiency: Our innovative design features three arms and three grippers operated by a sophisticated multi-degree-of-freedom manipulator. Each arm has a maximum lifting force of 1.5 tons, making it ideal for the installation of prefabricated arches, performing various benching method operations, and ensuring precise positioning and adjustment. The entire process of constructing vertical supports can be completed in about an hour, showcasing unmatched efficiency.
Installation of Prefabricated Arch Frames: We utilize our patented multi-frame prefabricated segmented assembly techniques (Patent No. ZL20222537953.5) to construct arch frames outside the tunnel. This innovation significantly reduces the time spent on hazardous surfaces, lowers construction risks, and dramatically improves overall efficiency.
Fewer Operating Personnel: Our advanced system allows the entire construction operation to be executed by just 3 people, a stark contrast to traditional methods that require 8 or more personnel.
Additional Options: Based on specific needs, various optional features can be integrated, such as an electric drive for hydraulic systems, a breaker for under-excavation tasks, and electric welding machines, among others.