After-sales Service: | 6 Month |
---|---|
Warranty: | 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Total Weight: | 38t |
Engine Power: | 138.5kw (National IV) |
Customization: |
---|
Suppliers with verified business licenses
The LGM312N The LGM312N intelligent integrated arch anchor trolley is a marvel of modern engineering, designed with an advanced engineering chassis and outfitted with a sophisticated dual anchor system. This innovative machine boasts four-wheel steering and drive, two-way mobility, and a versatile diesel-electric dual power system that ensures seamless operation in both electric and emergency diesel modes. Its cutting-edge three-arm remote control facilitates intricate tasks such as prefabricated arch frame installation and precise positioning adjustments, enabling under-excavation and welding operations with remarkable flexibility.
Functional Integration: The intelligent integrated arch anchor trolley seamlessly combines multiple critical processes into one cohesive operation. These include precise measuring and point placement, under-excavation, arch frame installation, anchor net setup, advance support, system anchor construction, optional anchor grouting, and much more.
Equipment Digitization (Optional): Our optional digital suite includes cluster management, precise positioning, video surveillance, a walkie-talkie function, pre-warning and alarm features, comprehensive data management, BIM technology, a digital twin for tunnel construction, detailed construction reporting,
tunnel contour scanning, remote control capabilities, and many other advanced functions.
High Efficiency: This extraordinary equipment features a robust three-arm, three-gripper, and three-basket structure, with the middle arm capable of lifting up to 3 tons. Impressively, the entire construction process can be completed in approximately one hour, streamlining operations significantly.
Installation of Prefabricated Arch Frames: Utilizing our company's patented techniques for multi-frame prefabricated segmented assembly and folding arch frame installation, the arch frames are constructed outside the tunnel. This innovative approach drastically reduces the time spent on hazardous surfaces, thereby minimizing construction risks and boosting overall efficiency.
Dual Anchor System: The LGM312N's advanced dual anchor system features a maximum drilling depth of 4.5 meters, with both the left and right arm frames capable of executing feet locking, system anchoring, and advance anchoring operations simultaneously.
Rotating Deployable Hanging Basket: Equipped with a spacious rotating hanging basket, this feature allows for the convenient installation of explosives and anchor rods, enhancing operational safety and efficiency.
Optional Grouting Function: The optional grouting system enables swift and efficient grouting operations immediately after anchor installation, further streamlining the construction process.
Less Operating Personnel: Remarkably, the entire construction operation can be managed by just 3-4 personnel, a significant reduction from the traditional requirement of 8 or more, thus optimizing labor costs and operation efficiency.
Auxiliary Function Integration: The equipment is also equipped with supplementary tools such as a breaker hammer and a welding machine, which can perform under-excavation processing and welding operations during arch installation, providing a comprehensive solution for complex construction tasks.
Suppliers with verified business licenses