After-sales Service: | 6 Month |
---|---|
Warranty: | 6 Month |
Certification: | CE, RoHS, ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Total Weight: | 38t |
Engine Power: | 138.5kw (National IV) |
Customization: |
---|
Suppliers with verified business licenses
The LGM312N The LGM312N intelligent integrated arch anchor trolley is a masterpiece in engineering, boasting an advanced chassis and a dual anchor system. This marvel features four-wheel steering, four-wheel drive, and two-way driving capabilities. Its diesel-electric dual power system ensures seamless electric construction and reliable diesel-powered emergency operations. The three-arm remote control is meticulously designed to meet the stringent requirements for prefabricated arch frame installation, various benching methods, and precise positioning adjustments. Additionally, the flexible arch frame facilitates under-excavation and welding operations, enhancing the adaptability of the tunnel construction.
Functional Integration: Our intelligent integrated arch anchor trolley seamlessly integrates multiple processes into one. These include precise measuring and point placement, under-excavation operations, arch frame installation, anchor net installation, advance support, system anchor construction, optional anchor grouting, and more.
Equipment Digitization (Optional): Our system offers robust digital capabilities, including cluster management, precise positioning, video surveillance, walkie-talkie functions, pre/alarm notifications, comprehensive data management, tunnel BIM technology, digital twin, construction reporting, tunnel contour scanning, remote control, and additional cutting-edge features.
management, tunnel contour scanning, remote control and other functions.
High Efficiency: Leveraging a three-arm, three-gripper, and three-basket structure, the LGM312N maximizes efficiency with a middle arm lifting force of up to 3 tons. The complete construction process is streamlined to take approximately one hour.
Installation of Prefabricated Arch Frames: Employing our patented multi-frame prefabricated segmented assembly and folding techniques, arch frames are efficiently produced outside the tunnel. This innovation minimizes the time spent on hazardous surfaces, enhances construction safety, and significantly boosts overall efficiency.
Dual Anchor System: With a maximum drilling depth of 4.5m, the left and right arm frames can simultaneously execute feet locking, system anchoring, and advance anchoring operations, ensuring superior performance.
Rotating Deployable Hanging Basket: Equipped with a rotating hanging basket, the equipment offers a generous operating space ideal for installing explosives and anchor rods, enhancing operational versatility.
Optional Grouting Function: An optional grouting system enables rapid grouting operations post-anchor installation, adding to the machine's multifaceted utility.
Reduced Operating Personnel: Revolutionizing traditional construction methods, the entire operation can be efficiently handled by just 3-4 people, compared to the 8 or more required by conventional systems.
Auxiliary Function Integration: Equipped with a breaker hammer and welding machine, the LGM312N can adeptly perform under-excavation processing and welding operations during arch installation.
Suppliers with verified business licenses