After-sales Service: | 6 Month |
---|---|
Warranty: | 6 Month |
Total Weight: | 30t |
Engine Power: | 176kw |
Installed Electrical Power: | 80kw |
Operating Mode: | Electric Construction + Diesel-Powered Emergency |
Customization: |
---|
Suppliers with verified business licenses
The LCG312C The LCG312C Intelligent Integrated Vehicle-Mounted Arch Frame Trolley is a revolutionary device that seamlessly integrates steel arch frame installation, welding mesh, connecting ribs, and excavation surface measurement. Designed with a versatile vehicle chassis, it boasts unparalleled flexibility in movement, transitions, and emergency responses. This equipment guarantees reliable and efficient performance across various scenarios. Featuring remote operation capabilities for all three booms and manual control options within the hanging basket for the left and right booms, this innovative trolley significantly reduces labor costs, mitigates construction risks, enhances efficiency, and achieves standardization and factory-level precision in tunnel vertical arch installations.
Optional Equipment Digitization: Our equipment can be optionally enhanced with state-of-the-art digitization features, including cluster management, precise positioning, video surveillance, intercom functions, pre/alarm notifications, comprehensive data management, tunnel BIM technology and digital twin capabilities, construction report management, tunnel contour scanning, remote control, and much more.
High Efficiency: Equipped with three arms and three grippers, alongside a multi-degree-of-freedom manipulator, this machine’s maximum single-arm lifting force is a robust 1.5 tons. It effortlessly meets the demands for prefabricated arch installations, various benching method operations, and precise arch positioning and adjustments. The entire construction procedure for vertical support is completed in just about an hour, reflecting our commitment to efficiency and excellence.
Installation of Prefabricated Arch Frames: Sichuan Lanhai Intelligent Equipment Manufacturing Co., Ltd. utilizes our patented multi-frame prefabricated segmented assembly installation techniques (Patent No. ZL20222537953.5) for producing arch frames outside the tunnel. This innovative approach significantly reduces working time on hazardous surfaces, enhances construction safety, and substantially boosts overall efficiency.
Reduced Operating Personnel: The entire construction operation is streamlined, requiring only 3 personnel, compared to the conventional need for 8 or more workers. This drastic reduction in manpower underscores our commitment to efficiency and cutting-edge technology.
Additional Options: Tailor the equipment to your specific needs with a range of optional features, including electric drive for hydraulic systems, breakers for under-excavation operations, electric welding machines, and more. These customizable options ensure that our machine meets the most demanding construction requirements.
Suppliers with verified business licenses